Aphrodite is the first discovery in the Cypriot EEZ so far, intended for local use and export to neighboring countries.
Status Development Pending
Resources 100.00 BCM
Working Interest 30.00%
Partners Chevron (35%), Shell (35%)
The Aphrodite natural gas field, located in Block 12 of the exclusive economic zone of Cyprus, has the potential to have the same transformative effect on Cyprus as Tamar and Leviathan had on Israel, in terms of national energy independence, significant revenues for the state and material environmental improvements.
The Aphrodite field is located 160 km south of Limassol, and 30 km northwest of the Leviathan field, in an area where sea depth is 1,700 meters. Aphrodite was discovered by the A-1 well in September 2011. The A-2 appraisal well, drilled in 2013, confirmed approximately 98 BCM of contingent resource with a potential for an additional 26 BCM of prospective resources. In 2023, the partners completed the A-3 appraisal well, on schedule and on budget, which is designed to serve as a future production well.
In November 2019, the Government of Cyprus granted the partners in Block 12 a production license for 25 years, with an option to extend the term by another 10 years, together with the approval of an outline for development of the reservoir. In February 2025, the Government of Cyprus approved an updated development plan, which includes a floating production facility with a capacity of approximately 800 million cubic feet per day, four production wells and a subsea pipeline to the Egyptian transmission system.
Following the approval of the updated development plan by the Government of Cyprus, the partners have commenced Front-End Engineering Design (FEED) in December 2025, with a total scope of approximately $106 million (100%). As part of the development plan, the partners will establish an independent floating production facility to be located at the reservoir. Furthermore, the Aphrodite partners, together with the Cyprus Hydrocarbons Company, have signed a Memorandum of Understanding for the sale of the total natural gas volume produced from the reservoir (approximately 100 BCM) to EGAS, the Egyptian Natural Gas Holding Company, at a daily quantity of approximately 700 million cubic feet during the main supply period, and have reached an agreement with the Egyptian government for the construction of a subsea pipeline connecting the reservoir to the Egyptian transmission system at Port Said.
The Final Investment Decision (FID) is expected to be reached in 2027, with first gas anticipated in 2031.